Page 40 - Valparaiso, IN SR 49 Corridor Plan
P. 40

38






            3.0 Goals and Strategies










            The following provisional goals, strategies, actions and initiatives   and beyond are regarded as both prime agricultural and prime   Focus Area 1: Residential and Commercial   in drafting design guidelines for all development within the SR
            for the SR 49 corridor have been developed to advance the desires   developable land. In order to consolidate high-quality office /  Growth and Development               49 corridor. Deserving particular consideration, with respect
            of local citizens and community leaders who have a stake in the   professional development close to the SR 49 thoroughfare and                                            to drafting guidelines to regulate development and manage
            future of the SR 49 corridor, and want to preserve and manage   preserve agricultural lands, county roads and settlement patterns—   GOAL 3.1: ACCOMMODATE RESIDENTIAL AND   scenic resources are the following county roads within the SR
            landscape character of the corridor in the face of potentially   the elements that provide the rural landscape character that Porter   COMMERCIAL GROWTH AND DEVELOPMENT   49 corridor:
            rapid residential and commercial growth and development. The   County is known for—an arterial thoroughfare is proposed to run   WITHIN THE SR 49 CORRIDOR WHILE PRESERVING   •   CR E 400 N (SR 49 to CR N 400 E);
            goals were also developed in part to advance the objectives of   just east of and parallel to SR 49. This alternative thoroughfare   LANDSCAPE CHARACTER.
            recently drafted, citizen-driven local and regional programs and   will provide access to large portions of developable land, and will                                    •   CR E 500 N (SR 49 to CR N 450 E);
            plans, which call for improvements to transportation and utilities   extend southward the Valparaiso Health Center campus proposed   Strategy 3.1.1: To increase the degree of control, regulation and   •   CR E 600 N (SR 49 to U.S. Highway 6);
            infrastructure, and methods for stimulating sustainable economic   at the interchange of SR 49 and CR E 500 N. This thoroughfare,   enforcement of land use within the SR 49 corridor, the City of   •   CR E 650 N (CR N 200 E to N Old Suman Road);
            development.                                           named Memorial Drive Extended will intersect Vale Park Road   Valparaiso should develop an annexation program to incorporate
                                                                   and continue southward, where it will provide access to additional                                                 •   Meska Road (N. Calumet Road to its terminus);
            It is understood that growth and development will occur within   lands for office park development as well as a proposed multi-  the remaining areas of the corridor, as currently delineated within   •   N Old Suman Road (CR E 600 N to U.S. Highway 6);
            the region, within Porter County, and within the SR 49 corridor.   family housing development, before it reaches Evans Avenue.   the Envision 2030 Comprehensive Plan and illustrated in Map 3.1,
            The principal objective of this report is to devise goals, strategies   Departing the western alignment of Evans Avenue, Memorial Drive   Future Annexation Plan, into the City’s corporate limits.   •   CR N 300 E (CR E 500 N to CR E 600 N);
            and actions through which to guide and direct the nature of   Extended becomes elevated, spans the Grand Trunk Railroad, and   Initiatives and Actions:                   •   CR N 325 E (CR E 400 N to CR E 500 N);
            development so it does not destroy the unique qualities, fabric and   slopes down to connect with Porter’s Vale Boulevard and the SR
            character of the remaining rural landscape. For several reasons,   2 / LaPorte Avenue. Crossing SR 2 Memorial Drive Extended will   1.  Develop a multi-phased annexation program and associated   •   CR E 700 N (N. Calumet Avenue to Meridian Road);
            the City of Valparaiso is regarded as being a free-standing city.   directly connect with the Eastport Centre Technology Park and   service planning for gradual expansion of the City limits that   •   Meridian Road (CR E 600 N to U.S. Highway 6);
            Its citizens want it to remain that way. The Valparaiso Chain of   beyond to the expanding Porter County Regional Airport.  prioritizes the annexation of key parcels within the corridor,
            Lakes Conservation Area, the Moraine Nature Preserve and Coffee                                                    where  determined  feasible  and  beneficial,  according  to  the
            Creek watershed area, combined with significant regional parks   An ambitious plan, the development of Memorial Drive Extended   ability of the City to prove that the area meets the State of
            such as the Sunset Hill  Farm  County Park,  and vast  areas  of   ensures a coherent pattern of contiguous development that   Indiana annexation requirements, with  respect to  parcel
            remaining prime agricultural lands provide a dense green buffer to   prevents sprawl and preserves open space and rural landscape   contiguity  with  municipal  boundaries;  that  the  City  can   Map 3.1
                                                                                                                                                                                                               County Hwy 700
            the north. This green buffer has been effective in halting southerly   character. The proposed thoroughfare promotes connectivity and   provide the requisite services to said parcels; and the degree   County Road 400  Future Annexation Plan
                                                                                                                                                                                                             Meridian
            movement of sprawl and marginal development from the north.   access management to existing transportation corridors while   to which the parcels will contribute to the city’s tax base. The   Damon Run               Coffee Creek
            It is through this area that SR 49 passes, and the reason for the   providing synergies with adjacent complementary land uses. The   annexation plan should be consistent with the City’s growth   County Hwy 600
            corridor’s northern segment to be referred to as the “rural reach.”   SR 49 Corridor Plan promotes the development of livable centers –   sequencing plan and coordinated with its capital improvement   U V                            Map 7.5
                                                                                                                                                                                          149
            This Corridor Plan provides strategies for strengthening this green   multiple use campuses at key interchanges, such as U.S. Highway   plan.                                                    Andover
                                                                                                                                                                                        500 Pepper Creek                                            Annexation Areas
            buffer so agricultural open space can be preserved and managed   6, CR E 500 N and CR E 400 N, to augment transit-oriented   Strategy 3.1.2: Regulate the location of residential and commercial          U V 49
            in perpetuity.                                         development. Improved interchanges at SR 2 and CR E 500 N,   land use within the SR 49 corridor.                                                        U V 49                   Legend  Future City Limits Expansion
                                                                   and the removal of the CR E 600 N interchange increases the                                                                      County Hwy 150  Beauty Creek                       Annexation Area
                                                                                                                                                                                                                                                       City Limits
            It is within the middle reach of the SR 49 corridor where the   SR 49 thoroughfare’s safety, level of service and longevity. Multi-  Although the City of Valparaiso Comprehensive Plan recommends   Campbell                              Study Area
            greatest amount of development is projected. It is also where the   modal improvements including recommendations for complete   infill development within the city limits, residential development   U V                   U V 2           Valparaiso University
                                                                                                                                                                                                                                                       Airport
            City of Valparaiso’s image, as a growing metropolitan community   streets and expanding the network of recreational trails provides   will likely continue to occur within Porter County’s unincorporated   130  Evans  County Road 300  325  Wetlands, Ponds, and Lakes
                                                                                                                                                                                                                                                       Flood Zone (A)
            will be defined. The interchange at CR E 500 N is a principal   enhanced connectivity for multiple users throughout the City of   areas east of SR 49. To preserve open space and maintain the      Morgan                                 Flood Zone (AE)
                                                                                                                                                                                                                                                       Streams and Rivers
            access point to Valparaiso’s northern neighborhoods to the west   Valparaiso and Porter County.                integrity of agricultural land uses and overall landscape character,                Washington  U V 2  U V 2                Railroad
            and provides a strong sense of arrival. It is also the site of the                                             it is recommended to prohibit large-scale residential development                     Valparaiso University
            recently developed Valparaiso Health Center, the anchor for what   These and several other recommendations for the SR 49 corridor   (subdivisions) in excess of ten acres within the SR 49 corridor.  £ ¤ 30         Porter County Regional Airport
            is envisioned to be a significant complex of healthcare service   are outlined within the following focus areas:
            providers and professional offices. Along with the development                                                 Initiatives and Actions:                                                 U V 2
            of the Porter County Regional Hospital complex and associated   •   residential and commercial growth and development;  1.  In anticipation of a proposed annexation plan strategy for   Abington
            development at the U.S. Highway 6 interchange it is envisioned   •   transportation infrastructure;                the remaining lands within the corridor, to preserve and                      Salt Creek   U V                                 ¯
            that SR 49 could become a major healthcare corridor for northern   •   utilities infrastructure;                   maintain the rural and scenic qualities of Porter County,                                  49                     0  0.35  0.7  1.4 Miles
            Indiana.                                                                                                           and to encourage agricultural and rural activity, develop an   Source: Envision 2030 Valparaiso Comprehensive Plan     ADOPTED 06.24.13
                                                                                                                                                                                                                         Salt Creek
                                                                                                                                                                                                   Sievers Creek
                                                                   •   economic development and corridor promotion.            intergovernmental agreement between the City of Valparaiso
            Within the middle reach, the western portions of the SR 49 corridor                                                and Porter County whereby the County will work with the City
            is largely built-out. The lands to the east of County Roads 300
         38
   35   36   37   38   39   40   41   42   43   44   45