5.6 Order of Magnitude Costs




                 The cost estimate for improvements to US Highway 421 / S.                                                     The cost estimate for extending Ohio Street south of CR W
                 Franklin Street includes narrowing of the thoroughfare through                                                400 N includes signalization at the intersection of Ohio Street
                 saw-cutting and removing asphalt pavement and subbase;                                                        and CR W 400 N; clearing and grading, the construction of the
                 miscellaneous drainage, backfilling, grading, and drainage                                                    roadway; finish grading;and stabilization; the construction of a
                 improvements; the construction of concrete curbs and gutters                                                  10 ft. wide recreational trail; and the installation of street trees
                 on both sides of the roadway; the construction of sidewalks;                                                  and ornamental street lights. The estimate does not include land
                 the installation of ornamental street lights and street trees;                                                aquisition.
                 and restriping of the thoroughfare. The cost estimate does not
                 include roadway resurfacing.

                 Table 5.6.7 US Highway 421 / S. Franklin Street Improvements                                                  Table 5.6.8 Extension of Ohio Street South

                  Table 5.6.7 US Highway 421 / S. Franklin Street Improvements                                                 Table 5.6.8 Extension of Ohio Street South
                                                                       US Highway 421 / S.                                                                                           Extension of Ohio   Signalization at
                                                                       Franklin Street from CR                                 Item Description                             Unit     Street South  Ohio Street and CR
                                                                       400N to Coolspring Avenue
                  Item Description                   $ / Single Unit                                                                                                                 (Note 1)      W 400 N
                                                                       Transportation Improvements
                                                                       (Lane narrowing & drainage                              General
                                                                       for 10,560’)
                                                                                                                               Construction Engineering (15%)                              $251,265       $52,500
                  General
                                                                                                                               Mobilization/Demobilization (5%)                             $83,755        $17,500
                  Construction Engineering (15%)                                     $906,613
                                                                                                                               Clearing ROW (2%)                                            $33,502        $7,000
                  Mobilization/Demobilization (5%)                                   $302,204
                                                                                                                               Erosion Control (1%)                                         $16,751        $3,500
                  Demolition (5%)                                                    $302,204
                                                                                                                               Maintenance of Traffic (2%)                                  $33,502        $7,000
                  Erosion Control (1%)                                                $60,441
                                                                                                                               Earthwork
                  Maintenance of Traffic (2%)                                        $120,882
                  Earthwork                                                                                                    Subgrade Treatment                                        (2) $111,100
                                                                                                                               Aggregate Pavement and Bases
                  Subgrade Treatment                                                       0
                  Aggregate Pavement and Bases                                                                                 Structure backfill, Drainage Improvements                 (2) $225,000
                  Structure Backfill, Drainage Improvements       $157              $1,657,920                                 Common Excavation (assumed depth 1.5 ft)                  (2) $260,000
                  Common Excavation (assumed depth 1.5 ft)      $49.50               $522,720                                  Asphalt Pavement
                  Asphalt Pavement                                                                                             HMA Pavement                                              (2) $412,500
                  HMA Pavement                                  $62.85               $663,696                                  HMA for tack coat                                            (2) $500
                  HMA for tack coat                                 $1                $10,560                                  ROW Stabilization
                  Concrete Curb and Gutter                         $50               $528,000                                  Finish grading                                             (3) $25,000
                  Hydro-seeding/mulching                        $26.70               $281,952                                  Hydro-seeding/mulching                                     (3) $10,000
                  Incidental Construction                                                                                      Recreational Trail (10 ft. wide)           linear foot    (4) $216,000
                  Pavement Striping                                $24                $25,344                                  Incidental Construction
                  Sidewalk, Concrete (5 ft. wide)               $13.90               $146,854                                  Striping                                   linear foot     (5) $15,000
                  Trees, 50 ft. O.C.                               $45               $475,200                                  Trees, 50 ft. O.C.                                              $50,000
                  Ornamental street lights (100 ft. O.C., staggered)  $140          $1,478,400                                 Ornamental street lights (100 ft. O.C., staggered)             $350,000
                  Removal Items                                    $24               $253,440                                  Total (in 2015 dollars)                                    $1,675,100     $353,000
                  Total                                                            $6,044,086                                  Contingency (20%)                                     $335,020             $70,600
                  Contingency (20%)                                                 $1,208,974                                 Grand Total                                           $2,428,895          $423,600
                  Grand Total                                                     $8,945,404                                   (1)   Extension of Ohio Street south (CR 1050 W) to Interstate 94 ROW: two lane road (25 ft. width) approx. 2,500 lin.
                                                                                                                                     feet (62,500 sq. ft.)
                                                                                                                               (2)   Area of roadway = 62,500 sq. ft.
                                                                                                                               (3)   Area of disturbance = 25 ft. on either side of roadway (total area; 125,000 sq. ft.)
                                                                                                                               (4)   Total approximate length: 2,500 lin. ft. ($76 per lin. ft = 10’ wide, on 6” compacted stone subbase, 2 ft. of earth-
                                                                                                                                     work, stabilization
                                                                                                                                                                                                                                     5-67

                                                                                                                                                                                Adopted: August 16, 2016          Implementation  5.0