Page 41 - Valparaiso, IN U.S. 30 Corridor Plan
P. 41

Adopted July 25, 2011





                           Perhaps the most needed public improvement in this section is a realignment of Silhavy
                           Road which is a combination north-south through-street and truncated service road.
                           The fact that Silhavy has no western outlet forces all through traffic onto Highway 30
                           and causes traffic back ups at the existing traffic signals at Highway 30. The City should
                           continue to examine ways to relieve this problem by either realigning Silhavy well to the
                           north of its current path so that it can tie directly in to Sturdy Road and/or to connect its
                           extreme western end to Sturdy Road via Warbler Drive. The latter should be part of any
                           redevelopment project(s) affecting the western end of the frontage road.






                                                                              Right and below: New
                                                                              development should
                                                                              frame the intersection
                                                                              at Sturdy Road creating
                                                                              a formal entry to the VU
                                                                              campus and the City.






















































                                                                                                                                                                                                                                       15
   36   37   38   39   40   41   42   43   44   45   46