Page 82 - Valparaiso, IN U.S. 30 Corridor Plan
P. 82
35 35 A-1 A - 1
1 1
A D O PT E D J U LY 25 , 2 01 A DOPT E D J ULY 25, 201 Quantity 1 1 2 3 2
X X Metal post and beams, heavy structure to replace existing (increase in span from 65' to 75' width) Reinforced concrete to support railway, with brick veneer and stone or precast capstones Masonry veneer stone & brick, with stone or precast capstones, over reinforced concrete block, surrounding metal structural posts Wood or High Density Urethane, with internally lit logo panels (one side), & metal roof T imber guardrails and po
I I STREETSCAPE PROJECT AND MATERIALS LIST Reinforced concrete railway deck Reinforced concrete railway deck
D D Description
N N Intersection improvements - Decorative Signals / Accented Crosswalks
PPE P P Metal structure Wing walls Columns Deck / railway Finials (4) Decorative wood railings Widened roadway Structure Wing walls / columns (4) Deck / railway Finials Pedestrian Bridge Metal structure Decorative metal railings Finials (4) Columns (4) Foundation Deck / pathway paving Approach ramps Renovated signals Decorative crosswalks Column Foundation Plaza surrounding
E New Hwy 30 Railroad Bridge (to replace existing) Renovated Washington Street Railroad Bridge Clocktower Monument (approx. 30' ht x 7' w. at base)
A A Finial
30