Page 81 - Valparaiso, IN U.S. 30 Corridor Plan
P. 81

1
       1
       A DOPT E D  J ULY  25, 201
       A D O PT E D   J U LY   25 ,   2 01
                                            N  X  X  I  I  D  D  N STREETSCAPE PROJECT AND MATERIALS LIST  Quantity Description  1 Metal post and beams, heavy structure to replace existing (increase in span from 65' to 75' width) Reinforced concrete to support railway, with brick veneer and stone or precast capstones Masonry veneer stone & brick, with stone or precast capstones, over reinforced concrete block, surrounding metal structural posts Reinforced concrete railway deck Wood o

                                            PPE  P  P    Metal structure  Wing walls  Columns  Deck / railway  Finials (4) Decorative wood railings Widened roadway  Structure Wing walls / columns (4)  Deck / railway  Finials Pedestrian Bridge  Metal structure Decorative metal railings  Finials (4)  Columns (4)  Foundation Deck / pathway paving Approach ramps  Renovated signals Decorative crosswalks  Column  Foundation Plaza surrounding
                                            E          New Hwy 30 Railroad Bridge (to replace existing)  Renovated Washington Street Railroad Bridge  Clocktower Monument (approx. 30' ht x 7' w. at base)










                                            A  A                                                        Finial






































                                                                                                                   30
   76   77   78   79   80   81   82   83   84   85   86