Page 81 - Valparaiso, IN U.S. 30 Corridor Plan
P. 81
1
1
A DOPT E D J ULY 25, 201
A D O PT E D J U LY 25 , 2 01
N X X I I D D N STREETSCAPE PROJECT AND MATERIALS LIST Quantity Description 1 Metal post and beams, heavy structure to replace existing (increase in span from 65' to 75' width) Reinforced concrete to support railway, with brick veneer and stone or precast capstones Masonry veneer stone & brick, with stone or precast capstones, over reinforced concrete block, surrounding metal structural posts Reinforced concrete railway deck Wood o
PPE P P Metal structure Wing walls Columns Deck / railway Finials (4) Decorative wood railings Widened roadway Structure Wing walls / columns (4) Deck / railway Finials Pedestrian Bridge Metal structure Decorative metal railings Finials (4) Columns (4) Foundation Deck / pathway paving Approach ramps Renovated signals Decorative crosswalks Column Foundation Plaza surrounding
E New Hwy 30 Railroad Bridge (to replace existing) Renovated Washington Street Railroad Bridge Clocktower Monument (approx. 30' ht x 7' w. at base)
A A Finial
30