Page 79 - Valparaiso, IN U.S. 30 Corridor Plan
P. 79

Adopted July 25, 2011


                                                                              5-Year Planning Goals



                        Tracks                             2011-2012                   2013-2014                 2015-2016                   2017+
                      1. Legal/Regulatory

                                                  •  Outreach
                        a. Zoning & Design Guidelines  •  Amendment drafting
                                                  •  Resolution, adoption
                                                  •  Meetings with City
                        b. ETJ Authority          •  Filings, notices          •  Implementation
                                                  •  Public hearings
                        c. Annexations            •  Pre-annexation draft language                     •   Ongoing with service extensions

                      2. Direct Public Investment
                                                                                                         •   Phase 2 Construction (east
                                                  •  Design and engineering    •   Phase 1 construction (Wash
                        a. Streetscape                                                                       gateway) Phase 3 con-
                                                  •  Peg. funding sources         @ US 30)
                                                                                                             struction (west gateway)
                                                  •  Blight study              •  TIF project plan
                                                  •  Statutory redevelopment plan  •  Infrastructure needs incor-  •  Land assembly  •  Land assembly
                        b. TIF District (Wash @ US 30)                                                   •  Sitework
                                                  •  Meetings with property owners,   porated in to CIP  •  Developer recruitment  •  Developer recruitment
                                                     taxing bodies             •  District creation
                                                                                                         •   Preliminary design of
                                                  •  Engineering construction
                                                  •  Coordinated with other devel-  •   Begin preliminary alterna-  major  intersection im-
                        c. Infrastructure                                         tives analysis on Silhavy   provements: Sturdy Rd.,
                                                     opment and incorporate into   realignment               Washington St., and
                                                     CIP
                                                                                                             Hayes-Leonard Rd.
                        d. Underground wires                                   Coordinated with infrastructure work and private development
                        e. Salt Creek restoration &
                        stormwater management plan  •   Grant procurement      •   Planning              •   Implementation
                      3. Incentives
                                                  •  Peg. funding sources
                        a. Façade grants          •  Establish eligibility criteria
                                                  •  Program launch
                                                  •  Concept white paper       •  Fund-raising
                        b. Hwy 30 loan fund       •  Recruit fund-raisers      •  Underwriting criteria  •  Program launch
                                                  •  ID funding sources
                      4. Privately-led Initiatives
                        a. VU Joint Maintenance
                        agreement                 •  MOU                                             VU maintenance of Campus Drive segment
                                                  •   Business owner outreach   •   Formation of business as-  •  Creation of BID district
                        b. Hwy 30 Business Association                                                                             •   Maiden project launch
                                                     meetings                     sociation              •  BID plan

















              34
              34
   74   75   76   77   78   79   80   81   82   83   84